The cheapest time to run network cable is the one window most homeowners never think about until it has already closed. Renovation Network Pre-Wiring Aurora gets structured cable into open walls before drywall makes every future run three times the cost.
A renovation with walls open down to the studs is the single best opportunity a homeowner will ever have to build real wired infrastructure into a home, and it rarely comes around twice. Electrical Services Ontario works with homeowners and contractors to plan cable runs, wiring closets, and access point locations while framing is still exposed, because the labor difference between running cable through an open wall and fishing it through a finished one is not a small markup, it is often three to five times the cost for the exact same result once everything is finished and painted.
Running cable through open framing takes a fraction of the time fishing the same cable through finished walls requires, since there is no drilling through top plates, no navigating around insulation blindly, and no drywall patching afterward. A run that takes fifteen minutes with open studs can take over an hour once walls are closed, and that labor difference compounds fast across a whole-home cabling project with a dozen or more drops planned.
Homeowners in Aurora who skip this planning during renovation often end up choosing between running cable exposed along baseboards, which looks unfinished and performs worse than a properly concealed in-wall run, or accepting a Wi-Fi-only setup that never quite delivers the coverage and reliability a wired backbone provides. Open-wall cable pathways during renovation remove that compromise entirely.
The timing window is also narrower than most homeowners assume. Once framing inspection passes and insulation goes in, the opportunity to run cable cheaply closes for good, which means the conversation about network pre-wiring needs to happen early in the renovation planning process, not as a last-minute addition once drywall crews are already scheduled.
A proper Renovation Network Pre-Wiring Aurora plan starts with identifying every room and location that could benefit from a wired connection: home offices, living rooms with streaming devices, bedrooms, outdoor access point locations, and any spot where a security camera might eventually go. Our technicians walk the space with the homeowner or contractor before framing closes, marking exact drop locations and confirming the plan against the electrical and plumbing rough-in to avoid conflicts.
CONTACT US TO BOOK YOUR APPOINTMENT
Cable gets run to each marked location and terminated at a central wiring closet, where a patch panel organizes every connection into a labeled, serviceable hub. Patch Panel Installation happens as part of this same process, since running cable without a proper termination point just moves the disorganization problem from the walls into the closet instead of solving it.
Every run gets tested for continuity before drywall goes up, since a bad termination discovered after walls close means either living with a dead run or paying retrofit-level labor to fix a mistake that could have been caught in minutes during the open-wall stage. This testing step is inexpensive insurance against the exact cost problem pre-wiring is meant to avoid in the first place.
Every room does not need the same number of drops, and planning this correctly avoids both under-provisioning a space and paying for runs that never get used. A living room with a wall-mounted television, a streaming device, and a gaming console benefits from two or three drops in that single location, while a guest bedroom used only occasionally might only need one.
Home offices, media rooms, and any space with a desk setup or entertainment center typically need two to four drops to avoid a switch cluttering the space later. Kitchens with a wall-mounted display or smart hub also benefit from a dedicated run rather than relying on Wi-Fi for a device that stays in one fixed location year-round.
Outdoor access point mounting locations, garage or workshop connections, and ceiling-mounted camera positions are the drops homeowners most often forget to plan for during renovation, only to regret it once the space is finished and adding a run means cutting into new drywall. Outdoor Wi-Fi Installation and camera coverage should be part of the same conversation as indoor drops from the very start, not an afterthought addressed once the renovation is already complete.
A wiring closet planned during renovation should account for more than the current cable count, since a closet sized for exactly today's needs leaves no room for a future switch upgrade, an added camera system, or expanded smart home equipment. A minimum 14x14 inch panel area, or ideally a dedicated 2x2-foot wall section with a nearby dedicated outlet, gives enough room for a patch panel, a network switch, and space for future equipment without a second closet needed later.
Ventilation matters too, since active network equipment generates heat that needs somewhere to go, particularly in a smaller closet housing a PoE switch running cameras or access points. PoE Switch Installation planned into the same renovation benefits from this closet sizing decision being made correctly the first time. Planning for a vented door or a small fan during the renovation avoids retrofitting cooling into a finished space after the fact.
Location within the home matters as much as size. A central closet minimizes the longest cable run to any single drop, which keeps every connection well within the 100-meter distance limit Ethernet cable reliably supports, while a closet tucked in a far corner of the home can push distant drops closer to that ceiling than most homeowners realize until the math gets done.
Standard Cat6 cable supports gigabit speeds reliably and handles most home networking needs for the foreseeable future, making it the right default for the majority of drops in a residential renovation. Cat6A supports 10 gigabit speeds and offers better resistance to interference, which matters more for backbone runs between the wiring closet and a switch than for individual device drops.
Most homes do not need Cat6A throughout, but using it selectively on the runs that would be most expensive to reopen later, such as backbone connections or a primary home office drop, is a reasonable middle ground between cost and future-proofing. The incremental cost during renovation is minimal compared to what upgrading a single run would cost after walls close.
Cable jacket rating matters as much as category when a run passes through a plenum space used for HVAC return air, since standard PVC-jacketed cable is not rated for that environment and local code typically requires plenum-rated cable in those specific locations. Confirming this during the planning walk-through avoids a failed inspection or a costly cable swap after the fact.
Several situations make renovation-stage pre-wiring an especially strong opportunity that should not be skipped or left for a future retrofit project.
Any one of these situations justifies raising network pre-wiring with the contractor before framing closes. Renovations that check several of these boxes see the strongest return on the modest additional cost, since the alternative retrofit later would cost several times more for the same result.
A whole-home Renovation Network Pre-Wiring Aurora project, including running cable to 8 to 12 locations and terminating everything onto a patch panel, typically takes one to two days depending on home size and the number of drops planned. Smaller projects focused on a single renovated area, such as a basement finish or a home office addition, usually complete in a half day.
CONTACT US TO BOOK YOUR APPOINTMENT
Coordinating this work with the renovation's electrical rough-in stage is essential, since scheduling network pre-wiring alongside the electrician's visit avoids a second disruption to the same open walls and lets both trades confirm there is no conflict between planned runs before either team starts pulling wire.
Weather and construction schedule slippage are worth planning around as well, since a renovation timeline that shifts by a week or two can change when walls actually close. Staying in close contact with the general contractor about the framing inspection date keeps the pre-wiring visit scheduled at the right moment rather than either too early, before rough-in locations are finalized, or too late, after drywall has already started going up.
Renovation Network Pre-Wiring Aurora projects in the area typically range from $2,000 to $6,000 depending on the number of drops, cable type selected, and whether a full structured wiring closet is included. A smaller project with a handful of drops sits toward the lower end, while a whole-home build with ten or more locations and a dedicated closet sits higher. Contact us via contact us or call (289) 672-2825 to get a quote specific to your renovation.
The quote reflects the actual scope discussed with the homeowner or contractor, including drop count, cable type, and closet requirements, rather than a flat per-square-foot estimate that ignores how the space will actually be used. Homeowners around Aurora get a clear breakdown of what is included before framing closes and the opportunity to adjust the plan disappears.
Fishing cable through a finished wall requires locating a path free of obstructions, drilling access points that then need patching and repainting, and working blind through insulation and framing that a technician cannot see. What takes minutes with open studs during renovation can take an hour or more per run once walls are finished, and that labor difference is the entire reason retrofit pricing runs so much higher than renovation-stage pre-wiring.
Homeowners throughout Aurora who decide against pre-wiring during renovation and later want wired connectivity often end up compromising on drop locations, choosing wherever a path happens to be accessible rather than the ideal spot, simply because retrofitting the ideal location would cost too much to justify. Planning ahead during renovation avoids that compromise entirely.
Electrical Services Ontario is fully licensed and insured, and every Renovation Network Pre-Wiring Aurora project is backed by a satisfaction guarantee on every drop tested and labeled before the wall closes. With 15 years of experience coordinating low-voltage work alongside renovation and construction timelines throughout Aurora, our technicians know how to plan a cabling layout that serves the home for years, not just for the devices present on move-in day.
We work directly with contractors and electricians to schedule pre-wiring at exactly the right point in the renovation timeline, avoiding delays to the broader project while making sure the network plan gets built in properly rather than squeezed in as an afterthought. That coordination is why contractors in Aurora bring our team in early rather than leaving networking as a last-minute addition.
A renovation that includes proper network pre-wiring delivers a home that performs the way modern households actually use technology today, with reliable wired connections exactly where they are needed instead of a patchwork of extenders and workarounds added after the fact. Electrical Services Ontario plans and installs pre-wiring for renovations across Aurora, coordinating with contractors so the work happens at the right point in the timeline without slowing anything down.
contact us or call (289) 672-2825 before framing closes, and our team will walk the space to plan drop locations and a wiring closet that fits both the current renovation and where the home is headed in the years ahead.
Every service call starts with a unique situation. Here are the common issues customers contact us about and how our team handles them.

Tell us what is happening — no power, a breaker that will not reset, or a planned upgrade. We talk it through and book a time that works for you, including same-day for urgent calls.
A licensed electrician looks at the actual panel, circuit, and load rather than quoting over the phone, then gives you a firm written price with the scope set out line by line.
The electrician who quoted the job does the work. Drop sheets go down, permits are filed where the work calls for it, and you get an update before anything changes from the plan.
Every circuit is tested before we close the panel, the inspection is booked and the certificate handed over, and our labour is warrantied for two years.
Panel upgrades, rewiring, EV chargers, generators, and emergency repairs, all handled by licensed electricians who find the real fault and leave the work inspected.
Reach out to Electrical Services Ontario for panel upgrades, rewiring, EV chargers, generators, or emergency electrical repairs across Aurora.
Call, or send a message through the form below, either way an electrician gets back to you rather than a call centre.
CALL US (289) 672-2825 EMAIL US Click to send a messageYour message stays between us.
Fast response · No obligation · Your info stays private
Tell us what needs attention and our team will get back to you shortly with a clear, upfront quote.